Hernando, Pasco and Citrus · Wind mitigation

Getting a New Roof? What a Reroof Changes on Your Florida Wind Mitigation Form

The roofer is on the calendar, or the last bundle just went up, and your insurance agent wants a fresh wind mitigation inspection. This guide covers what to ask the roofer, what to photograph while the roof deck (the plywood under the shingles) is open, and when to book. Jay Sampson is a State-Certified Building Contractor and Florida-licensed home inspector (#HI8193), based on the west side of Spring Hill.

  • ✓ FL Licensed #HI8193
  • ✓ State-Certified Building Contractor
  • ✓ InterNACHI Certified
  • ✓ Same-Day Reports
  • ✓ 4-Point & Wind Mit Free With Full Inspection

Buying a reroofed home? Wind mitigation is FREE with your full inspection.

The wind mitigation form and the 4-point both come out of the same visit as the full home inspection, written for the house you are buying rather than for the seller's policy. Already own the house? All Corners does wind mitigation on its own too; call with your roof date.

Call Jay About It
Short answer

A reroof rewrites part of the form

Yes, plan on a new report. A roof replacement changes several answers on the wind mitigation form, so a report written before the job no longer matches the house. Citizens' own guide, for example, treats a form as valid within 5 years only when there have been no structural changes. Other carriers set their own rules, and your agent decides what yours accepts.

All Corners Home Inspection is Jay Sampson's inspection company, based on the west side of Spring Hill, FL. Jay is a State-Certified Building Contractor and holds FL License #HI8193, and the company handles wind mitigation, 4-point and full home inspections across Hernando, Pasco and Citrus counties.

The rest of this page follows the job in order: before the crew starts, while the deck is open, and after the final shingle. Most of what decides your new form happens in the middle part, on a day when nobody is thinking about insurance paperwork.

The law behind the job

What Florida asks of a reroof on an older home

Florida wrote a rule for this exact moment. Fla. Stat. 553.844 directs that on site-built single-family homes built before the Florida Building Code, a roof replacement include a secondary water barrier and strengthened or corrected attachment of the roof deck. On some homes nearer the coast, added roof-to-wall connections can be part of the job too.

Across Hernando, Pasco and Citrus, that describes a lot of houses: block homes from the 1970s through the 1990s now wearing their second or third roof. On many older homes here, the reroof itself adds features the last form never saw. The specifics depend on the house, the permit and the product, so your roofer and the permit office will tell you what applies to yours.

Here is the catch for the wind mitigation form. Much of that required work ends up under the new covering (the shingles, metal or tile), where nobody can look at it again without tearing the roof off.

Before the tear-off

Five questions for your roofer before the first shingle comes off

A good roofer hears these every week and answers them in a minute. Ask while the contract is still on the kitchen table, not after the dumpster leaves the driveway.

  • ✓Is the job permitted? The permit is the paper trail for the new covering. Keep a copy, with its number and date, in the same folder as your contract.
  • ✓Which product approval goes with this covering? Shingles, metal and tile each carry a Florida product approval or a similar listing. Citizens' guide says product approval and/or permits are needed for roof covering credit, so ask for the number in writing.
  • ✓How are you sealing the deck? Ask which method goes down between the deck and the covering: peel-and-stick over the whole deck, tape over the seams, a doubled layer, or something else. That answer decides how the sealed-deck question can be filled in later.
  • ✓Will the deck be re-nailed? Ask what nail size and spacing the crew uses to fasten the deck, and whether any sheets or boards are being replaced. Those nails are what an inspector reads from the attic afterward.
  • ✓Can I get photos of the deck before it is covered? Ask for pictures of the taped seams or the peel-and-stick across the deck, taken during the job, with enough of the house in frame to show which roof it is. Plenty of crews already shoot progress pictures for their own records.
Line by line

Which answers a new roof can move, and which it usually leaves alone

Here is how a reroof tends to sort the form's main sections. Your report records what the inspection finds and what the paperwork supports, nothing more.

Can change: roof covering

The form records the covering type, its permit date and its product approval. A new covering with its permit and approval in hand gives this section fresh information to work from.

Can change: roof deck attachment

Read from inside the attic, by the size and spacing of the nails coming through the deck into the framing. A reroof that re-nails the deck to a tighter pattern can read differently than the roof before it.

Can change: sealed roof deck (SWR)

The part the reroof rule aims at. Whether a qualifying sealed deck went down is the biggest open question on most reroofs, and the sections below explain why it is also the hardest to prove.

Unchanged: building code

This question asks which building code was in force when the house's original permit was applied for. A reroof does not change that answer. The new roof's permit date goes in the roof covering section instead.

Usually the same: roof shape and slope

Hip, gable or a mix, the roofline stays what the framer built. The revised form also records roof slope, so that gets noted along with the shape.

Usually the same: roof-to-wall

Toe nails, clips or straps at the truss ends sit below where a roof crew works. The exception is a reroof where connectors were added, which the permit and the roofer can tell you about.

Usually the same: opening protection

Windows, entry doors, sliders and the garage door are untouched by a roof crew. Skylights are the exception: they count as openings on the form, and a reroof often replaces or removes them, so tell the inspector if yours changed.

Sealed roof deck

What counts as a sealed roof deck now

The revised form retitles this question Sealed Roof Deck/Secondary Water Resistance. In plain words, it asks whether something under the covering would keep rain out of the house if wind stripped the shingles or panels away. Citizens' guide lists the kinds of work that qualify.

  • ✓Peel-and-stick across the deck. A self-adhering underlayment bonded to the whole roof deck.
  • ✓Tape over the seams. Self-adhering strips laid over every joint between deck sheets, under the regular underlayment.
  • ✓A doubled layer. Two layers of felt or synthetic underlayment, installed the way the form describes.
  • ✓Foam at the deck. Spray foam applied to the underside of the deck from the attic.

What does not count on the revised form: standard underlayment or hot-mopped felt by themselves. A brand-new roof can be well built and still lack a qualifying sealed deck. That is a question of method, not workmanship, which is why it belongs on your list of roofer questions.

For the other sections that were reworked on the revision, see what changed on the 2026 wind mitigation form.

Your homework

The one thing only you can do: photos before the deck disappears

Once the covering is on, the sealed deck is out of sight for good. Citizens' guide says as much: the secondary water barrier is generally not visible on a completed roof, so it looks for photos, permits, a FORTIFIED roof certificate (from a voluntary stronger-roof program) or other documentation. From the attic, an inspector sees the underside of the deck, not what was laid on top of it.

So ask your roofer for photos of the deck while it is open, after the tape or peel-and-stick goes down and before the shingles, metal or tile cover it. Keep them with the permit and the product approval. The report records only what the inspection and the paperwork can support, so the documentation is what carries this entry.

The report does not guess in the home's favor. If the sealed deck cannot be supported, the honest entry is unknown, and that is what the form shows. Photos are worth asking for, but nobody can promise how a given carrier treats them. Many carriers give credits for features the form documents; ask your agent.

Timing

When to book, and how to get the house ready

Book once the roof is finished and the paperwork is in your hands. A report written mid-job, or before the roofer hands over the permit details, has less to work from. If your renewal date is close, tell your agent when the roof was done and ask what they want first.

  • ✓Clear the attic hatch. Move the boxes, the shelf and the holiday bins. Citizens' guide notes that without attic access, the deck attachment entry is marked unknown.
  • ✓Put the paperwork on the counter. The reroof permit, the product approval for the covering, the roofer's invoice and the photos of the open deck.
  • ✓Mention anything else that changed. New or removed skylights, new windows, a new garage door or shutters added since the last form each move the opening protection section. Say so when you call.
Who reads your roof

A builder's read of the attic

Portrait of Jay Sampson
Jay Sampson, All Corners Home Inspection

Jay Sampson has been inspecting homes since 2013. He also brings 25+ years in insurance restoration, overseeing repairs on homes hit by hurricanes, fires and floods. He is a State-Certified Building Contractor with FL License #HI8193, and InterNACHI certified. A builder reads deck nailing and roof-to-wall connectors from the attic as part of how the house was put together, not as boxes on a form. More on Jay's background as a State-Certified Building Contractor.

From a Google review, Debra M.: “Jay has always been professional, on time and very thorough in his inspections for my customers. I highly recommend his services for your next home inspection/4pt/wind mitigation!”

Buying, not reroofing

Under contract on a house with a new roof

A recent reroof is good news on a listing, and the seller may hand over a wind mitigation form along with it. That form was ordered for the seller's own insurance, and whether your carrier will use it is a question for your insurance agent early in the inspection period. During the inspection period, ask the seller for the reroof permit, the product approval for the covering and any photos the roofer took of the deck before it was covered, and have them on hand for the inspection. With a full home inspection, wind mitigation is included free, along with the 4-point, so you get a current form for the house you are buying.

The roof's age and condition also show up on the 4-point. If your insurer later sends its own surveyor, read what happens when your insurance company sends an inspector.

How the visit goes

From your call to the finished form

Call with the roof date

Give Jay the address, when the roof was finished and what paperwork you have. That is enough to set the visit.

Roof, attic and openings

Jay inspects the covering, reads the deck nailing and the roof-to-wall connections from the attic, and checks every opening, with photos of each.

Each entry gets its support

The current form is filled in from what was seen and what the paperwork backs up. Anything that cannot be supported is marked that way.

Report the same day

You'll have the full report the same day. Afterward, Jay goes over each entry with you, so you know what to hand your agent.

Where Jay inspects

Hernando, Pasco and Citrus counties

BrooksvilleWeeki WacheeHudsonHomosassaHernando CountyPasco CountyCitrus County
Good to know

Reroof and wind mitigation questions

Do I need a new wind mitigation inspection after a roof replacement, and when should I schedule it?

In most cases yes, and the time to book it is after the roof is finished and the permit and product paperwork are in your hands. The reroof changes the covering and often the deck attachment and sealed-deck answers. Whether your carrier asks for the new form is your agent's call.

How long is a wind mitigation inspection good for in Florida?

It depends on the carrier, so ask your agent. Citizens, for example, treats a form as valid within 5 years when there have been no structural changes. Other carriers set their own rules, and a reroof is the kind of change that usually sends owners back for a fresh one.

What is secondary water resistance (SWR) on a roof, and what counts as a sealed roof deck?

SWR is a seal at the roof deck that keeps water out of the house if the roof covering is lost. The revised form calls it Sealed Roof Deck/SWR, and qualifying methods include peel-and-stick across the deck, tape over the deck seams, a doubled layer of felt or synthetic underlayment, or spray foam under the deck. Standard underlayment or hot-mopped felt alone does not qualify.

Why would my wind mitigation report say SWR is unknown on a brand-new roof?

Because the sealed deck is hidden under the covering and nothing on hand supported it. Citizens' guide calls the barrier generally not visible on a finished roof and looks for photos, permits, a FORTIFIED certificate or other documentation. Without that support, the report marks it unknown instead of guessing.

What is roof deck attachment on a wind mitigation form, and does a new roof change it?

Roof deck attachment is how the plywood or boards under your covering are nailed to the framing, read from the attic by nail size and spacing. A reroof that re-nails the deck can change it. If the attic cannot be reached, the form records no attic access, and Citizens, for one, treats that as unknown.

Will a new roof change my roof-to-wall connection (clips, straps or toe nails)?

Usually not, because a covering job does not reach the connections where the trusses sit on the walls. On some homes nearer the coast, Florida's reroof rule can call for added connections. Your roofer and the permit office can tell you whether that applies to your house.

What paperwork from my roofer should I have ready for the wind mitigation inspection?

Have the reroof permit, the product approval for the covering and the roofer's photos of the deck before it was covered. An invoice that names the underlayment and the deck nailing helps too. More on the visit itself on the wind mitigation inspection page.

New roof on the house? Get a form that matches it.

Wind mitigation on its own, or free with a full home inspection, with a same-day report and Jay going over it with you afterward. Based on the west side of Spring Hill, serving Brooksville, Hudson, New Port Richey, Homosassa, Inverness and the towns between. Call Jay to book.